The following 3 items MUST be at job site for inspection approval.
  1. Plans approved and stamped by SHWID.
  2. Receipt showing plans approved by SHWID (for Gila County submittal).
  3. An open trench showing that the sewer construction was done according to U.P.C.
    1. Cleanouts to be no more than 50' intervals.
    2. A "TEE" at sewer tap should be installed for static water test
A minimum of 24 hours notice may be required. However, most inspections will typically be done within 24 hours after calling.
A single construction inspection is included in the fee. If additional inspections are required due to contractor or owner, additional fees may be charged.